7.IRRIGATION

#space/ap-geography/IRRIGATION/PROJECTS

- Kurnool - kadapa kc canal
- pulivendula canal
- sir aurthur cotton barrage project
- sir arthur cotton barrage image.png
- somasila - swarnamukhi
- somasila project image.png


vam- Creation of Irrigation Potential continued to be the most prioritized area. So far {{106.64}} lakh acres of irrigation potential has been created up to December 2022 under major anicuts on-Krishna, Godavari and Pennar rivers, Projects like Nagarjuna Sagar, Telugu Ganga, Somasila, SRBC, Vamsadhara, Medium Irrigation projects and Minor Irrigation schemes.

  1. Major Irrigation Projects - Ayacut more than 10,000 hectars
  2. Medium Irrigation Projects - Ayacut between 2,000 - 10,000 hectars
  3. Minor Irrigation Projects - Ayacut less than 2,000 hectars

Utilization for Irrigation (In TMC)

?

River Basin Existing Projects Ongoing Projects Contemplated projects
1.Krishna river 512.040 150.500
2. Godavari river 308.703 468.688 119.756
3. pennar river 128.94 58.120 6.750
4. vamsadhara 28.605 12.142 6.935
5. other rivers 322.839 32.082
Total 1301.127 721.532 133.441

The achievements of irrigation sector in the state till now

?

1. Purushothapatnam Lift Irrigation scheme :
2. Kondaveeti vagu Lift Irrigation scheme:
3. Pattiseema Ettipothala project:
4. Handri-Niva Project :
5. Sangam Barrage:
6. Nellore Barrage:

Projects under Jalayagnam

?

New targets for the year 2022-23

?

The details of ongoing Jalayagnam projects are given below
  1. BRR (Bodepally Rajagopal Rao Vamsadhara Project Stage 1I&Phase II):
    • The scheme benefits 225 villages in 9 mandals of Srikakulam district, with the creation of 12,200 Acres new Ayacut. The target date of completion of this project is 2023.
    • vamsadhara project image.png
    1. (a) Sardar Gouthu Lachanna Thotapalli Barrage Project:
      • 10 Mandals covering 155 Villages in Vizianagaram district and 7 mandalas covering 132 villages in Srikakulam district. Apart from providing Irrigation Water, the scheme intends to feed 42 Tanks for drinking water supply in 24 villages enroute. with the creation of 47,888 Acres new Ayacut. The target date of completion of this project is 2023.
    • b. Gajapathi Nagaram branch canal: Target of completion of this project is 2023. with the creation of 15,000 Acres new Ayacut.
  2. Tharaka Rama Theertha Sagaram Reservoir:
    • Irrigation facilities to new ayacut 16,538 acres and stablize 8,172 acres under Denkada anicut in Vijayanagaram District. The target date of completion of this project is December 2023.
  3. Polavaram Irrigation Project:
    1. polavaram project image.png
    • The project is taken up as National project. It is a multipurpose terminal reservoir project located near Ramayyapeta village of polavaram mandal in Eluru District. It was accorded with status of National project under AP Reorganisation act 2014, The detials of the project given below..
    • Gross storage Capacity of Reservoir 194.6 TMC. Utilization of water under the project 322.73 TMC.
    • 80 TMC of Godavari water to be diverted to Krishna river.
    • Hydro Power Installed capacity is 960 MW
    • 7.2 lakh Acres of new ayacut to be created and Stabilization of 23.5 lakhs acres under KDS (Krishna Delta scheme) + GDS + Yeleru Delta Systems.
    • 7.2 lakh Acres of new ayacut of PIP includes the ayacut of 1.86 lakh
    • Acres under Pushkaram LIS and 2.066 Acres under Tadipudi LIS.
    • 23.44 TMC of water to the habitations and industries in and around Vishakhapatnam city including Vizag steel plant. Drinking water facility to 540 villages for a population of 28.5 lakh enroute canals.
    • The target date of completion of this project is June 2024
  4. Modernization of Godavari Delta System:
    • Stabilisation of Ayacut in East and West Godavari Dists.
    • The target date of completion of this project is 2023
  5. Modernization of Krishna Delta system:
    • Stabilisation of Ayacut in West Godavari, Krishna, Guntur and Prakhasam Districts. The target date of completion of this project is 2023.
  6. Varikapudisela LI Scheme:
    • Creating New aycut of 24900 Acrs in Macharla Area in Palnadu district.
    • The target date of completion of this project is 2023.
  7. Poolasubbaiah Veligonda Project Phase I:
    • The project is contemplated to provide irrigation facilities to about 4.47 lakh Acres & drinking water facilities to 15.25 lakh people in drought prone flouride affected 30 mandals of Prakasam, Nellore & Kadapa districts. This project is intended utilising 43.50 TMC of Krishna River flood water by gravity.
    • The target date of completion of this project is 2023.
    • Poolasubbaiah Veligonda Project Phase II: completion of this project is 2023.
    • pattiseema veligonda project image.png
  8. Korisapadu LI Scheme:
    • It envisages utilizing 1.330 TMC of water to irrigate 20,000 Ac under Micro-Irrigation system in Korisapadu & Naguluppalapadu Mandals of Prakasam district.
    • The target date of completion of this project is 2023.
  9. Modernization of Penna Delta System:
    • a. Pennar River Canal System:
      • Ayacut of 247000 acres covered in ayacut of 385000 acres of Sangam Barrage. It is constructed at sangam in nellore district.
    • b. Kanpur Canal System:
      • 72.37% was completed and 64000 Acres of ayacut is covered in ayacut of 385000 acres of Sangam barrage. It is in nellore.
  10. Galeru Nagari Sujala Sravanthi Phase - I & Phase II :
    • Creating New aycut of 2,58,500 Acrs. The target date of completion of this project is 2025 Phase-I and 2026 Pahse-II.
  11. Handri Neeva Sujala Sravanthi Project Phase - 1 & Phase II:
    • Creating New aycut of 5,33,417 Acrs in Kurnool, Ananthapur, Satyasai, Chittoor and Kadapa districts.
    • The target date of completion of this project is 2023
    • handri niva image.png

Important Irrigational Projects by old district wise

1) Projects in Srikakulam district

?

2) Projects in Vizianagaram district

?

3) Projects in Visakhapatnam district

?

4) Projects in West Godavari district

?

5) Projects in East Godavari district

?

6) Projects in Krishna district

?

7) Projects in Guntur district

?

8) Projects in Prakasam district

?

9) Projects in Nellore district

?

10) Projects in Kadapa district

?

11) Projects in Chittoor district

?

  1. Chinneru Project : It was constructed in Thamballapalli mandal on the Chinneru stream. m) Akumanugutta project : It was built on river Kushavati in Peddaman dyam mandal.

12) Projects in Kurnool district

?

  1. SLBC (Srisailam Left Bank Canal) : Provide water for Irrigation and drinking water in Nalgonda districts it has the 900 M.W of power installed capacity.
  2. SRBC (Srisailam Right Bank Canal) : Provide water for Irrigation in Kurnool & Kadapa districts it has the 770 M.W of power installed ca-pacity.
    • Water from Bhanakacharla regulator of kurnool district is being directed to SRBC canal and is used to irrigate 65,000 hectares the Gorakallu Balancing reservoir and Avuku reservoir were also built depending upon this canal.
    • Handri Neevai Intended to construct left Irrigation system at malyala of Nandikotkur mandal and 40Tmcs of water from Srisailam reservoir stream is lifted to irrigate 6.025 lakh acres in Kurnool, Ananthapur & Chittoor, districts and to provide drinking water to the region.
      • handri niva image.png

13) Projects in Anantapur district

?

  1. T.B.P.H.L.C. STAGE-II : The T.B.P.H.L.C. Scheme Stage-Il has been taken up during 1967 contemplating an irrigation potential to an extent of 32,063 acres in Ananthapuram District.

IRRIGATIONAL SOURCES IN A.P

?

A) Grass Area Irrigated

Source of Irrigation lakh hectares

?

  1. canals 17.54
  2. Wells 16.15
  3. Tanks 3.46
  4. Other sources 1.29

Districts having heighest potential

?

  1. Guntur 2. East Godavari
  2. West Godavari 2. Ananthapur
  3. Vizayanagarm 2. Srikakulam
  4. East Godavari 2. Vishaka
1. Canal irrigation

?

2. Well irrigation

?

3. Tank irrigation

?

4. Other source of irrigation

?

Major Irrigational projects in A.P

?

  1. Vamsadhara Project stage- Vamsadhara Srikakulam
  2. Vamsadhara Project stage-Il, Phase-I Vamsadhara Srikakulam
  3. Vamsadhara Project stage-Il, Phase-Il Vamsadhara Srikakulam
    1. vamsadhara project image.png
  4. Chagalnadu Ethipothala Project Godavari E. Godavari
    1. chagalnadu ehtipothala project image.jfif
  5. Puskara Ethipothala Project Godavari E. Godavari
    1. puskara ethipothala project image.png
  6. Godavari Delta system Godavari E. Godavari
  7. Eleru Reservoir Eluru E. Godavari (Now it is in Eluru)
    1. eleru reservoir image.png
  8. Tadipudi Ethipothala Project Godavari W. Godavari
  9. Polavaram Project Godavari W. Godavari (Now it is in Eluru)
    1. polavaram project image.png
  10. Krishna Delta system Krishna Krishna (Now it is in NTR)
  11. Tarakarama Ethipothala Project Budameru Krishna
  12. Pulichinthala Project Krishna Guntur (Now it is in Palnadu)
  13. Gundlakamma Project Gundlakamma Prakasam
  14. Sangam Penna Nellore
  15. Nellore Penna Nellore
  16. Somashila Project Penna Nellore
  17. Srisailam Project Krishna Kurnool
  18. Nagarjuna sagar Project Krishna Guntur & Nalgonda
    1. nagarjuna sagar image+

Medium Irrigational Projects in A.P

?

  1. Mudduvalaa Reservoir Suvarnamukhi Srikakulam
  2. Naryanapuram Nagavalli Srikakulam
  3. Paidigam Reservoir Mahendratanaya Srikakulam
  4. Janjuvathi Reservoir Project Janjuvathi Vijayanagaram
  5. Tarakarama Teerthasagaram Champavathi Vijayanagaram
  6. Taadipudi Reservoir Gosthani Vijayanagaram
  7. Thotapalli Reservoir Nagavalli Vijayanagaram
  8. Vengalaraya sagar Project Suvarnamukhi Vijayanagaram
  9. Vattigadda reservoir Ottigadda Vijayanagaram
  10. Denkaada Project Champavathi Vijayanagaram
  11. Pendakalam Project Suvarnamukhi Vijayanagaram
  12. Peddagedda Reservoir Peddagedda Vijayanagaram
  13. Seethanagaram Project Suvarnamukhi Vijayanagaram
  14. Andhra Reservoir Project Gambirama gedda Visakhapatnam
  15. Kosam Reservoir Project Naarava Visakhapatnam
  16. Raivaada Reservoir Project Sharadha Visakhapatnam
  17. Taandava Reservoir Project Taandava Visakhapatnam
  18. Pedderu Reservoir Project Pedderu Visakhapatnam (Now it is in Alluri district)
  19. Varaha Reservoir Project Varah Visakhapatnam
  20. Torrigedda Pamping scheme Godavari East Godavari
  21. Bhupathi palem reservoir project Seethapallivagu East Godavari (Now it is in Alluri district)
  22. Maddigadda Reservoir project Maddigadda vagu East Godavari
  23. Musurumilli Reservoir Project Seethavagu palli East Godavari (Now it is in Alluri district)
  24. Surampalem Reservoir Project Buradhakaluva vagu East Godavari (Now it is in Alluri district)
  25. Pampa reservoir project Pampa East Godavari
  26. SubbaReddy sagar Project Kunthidevi vagu East Godavari
  27. Kovaada Kaluva reservoir Kovaadakaluva vagu West Godavari
  28. Thammileru project Thammileru West Godavari
  29. Jalleru Reservoir Jalleru west godavari
  30. Muniyeru Anicut Muniyeru krishna
  31. V.R.Kota Anicut Manneru Prakasam
  32. Paleru, Bitragunta Anicut Paleru Prakasam
  33. Raalapadu Project Manneru Prakasam
  34. Lower Upputeru Anicut Upputeru Prakasam
  35. Mopadu Reservoir Project Manneru Prakasam
  36. Gandi palem Project Pillaleru Nellore (Now it is in Tirupathi)
  37. Araniyar Anicut Araniyar Chittoor
  38. Bahudha reservoir project Bahudha Chittoor (Now it is in Annamayya District)
  39. Pedderu Reservoir Project Pedderu Chittoor
  40. Peddalagandi project Thalakona Chittoor (Now it is in Tirupathi)
  41. Swarnamukhi Anicut Swarnamukhi Chittoor (Now it is in Tirupathi)
  42. Kalangi reservoir project Kaalangi Chittoor
  43. Krishnapuram reservoir project Laava Chittoor
  44. Mallimadugu reservoir project Raalakaaluva Chittoor (Now it is in Tirupathi)
  45. Uppar sagileru project Sagileru Kadapa
  46. Pencha project Pincha Kadapa (Now it is in Annamayya)
  47. Buggavanka project Buggavanka Kadapa
  48. Lower sagileru project sagileru Kadapa
  49. Varadaraja swami gudi project Munimadugula Kurnool
  50. Sanjeevaiah sagar project Hundri Kadapa
  51. Bhairavuni Tippa project Hagari Anantapuram
  52. Uppar Pennar project Pennar Anantapuram
  53. Yogivemana Reservoir Maddileru Anantapuram
  54. Chennarayaswami gudi project Papagni Anantapuram (Now it is in Satyasai)
  55. Pennar kumudwathi project Pennar Anantapuram (Now it is in Satyasai)

Important points at glance

Total net Irrigated land in AP - 29.52 lakh hectres

?

Grass cultivable land Net Cultivable land
Source of Irrigation Lakh hectares Highest Potential Lakh hectares Lowest Potential
1.canal 17.54 1. guntur 2. east godavari 13.44 1. guntur 2. krishna
2.well 16.15 1.west godavari 2. ananthapur 11.90 1.west godavari 2.ananthapur
3.Tanks 3.46 1.vijayanagaram 2.srikakulam 3.10 1.vizainagaram 2. nellore
4.others 1.29 1.East Godavari 2. vishaka 1.08 1.vishaka 2.kurnool
Total 38.44 29.52